Search results for: Tranche 0
SDA, MDA CONFIRM SUCCESSFUL LAUNCH OF TRANCHE 0 TRACKING AND THE HYPERSONIC AND BALLISTIC TRACKING SPACE SENSOR SATELLITES
Date: Feb. 15, 2024 On Wednesday, the Missile Defense Agency (MDA) and Space Development Agency (SDA) confirmed the successful launch of six satellites to low-Earth orbit at 5:30 p.m. ET from Space Launch Complex 40 at Cape Canaveral Space by SpaceX’s Falcon 9 rocket. The satellites, which include two satellites for MDA’s Hypersonic and Ballistic…
Read MoreSDA, MDA ANNOUNCE UPCOMING LAUNCH OF THE TRANCHE 0 TRACKING AND HYPERSONIC AND BALLISTIC TRACKING SPACE SENSOR AND SATELLITES
The Space Development Agency (SDA) and Missile Defense Agency (MDA) prepare to launch six satellites to low-Earth orbit on Feb. 14. The satellites will launch from Space Launch Complex 40 at Cape Canaveral Space utilizing SpaceX’s Falcon 9 rocket. This includes two satellites for MDA’s Hypersonic and Ballistic Tracking Space Sensor (HBTSS) and the final four SDA Tranche 0 (T0) Tracking Layer satellites of its Proliferated Warfighter Space Architecture (PWSA). (Photo Credit: Courtesy of SpaceX)
Read MoreSpace Development Agency Completes Second Successful Launch of Tranche 0 Satellites
SDA delivers 13 additional satellites on orbit for Proliferated Warfighter Space Architecture demonstrations Date: September 2, 2023 WASHINGTON, D.C. – The Space Development Agency (SDA) today announced the second successful launch of space vehicles from the Proliferated Warfighter Space Architecture (PWSA). The launch included Transport and Tracking Layer satellites that will demonstrate low-latency tactical data…
Read MoreSpace Development Agency Successfully Launches Tranche 0 Satellites
Date: April 2, 2023 | Outlet: DOD News SDA delivers first 10 satellites on-orbit, two-and-a-half years from award to launch The Space Development Agency (SDA) today announced the successful initial launch of Tranche 0 (T0) of the Proliferated Warfighter Space Architecture (PWSA), the Transport and Tracking Layer satellites that will demonstrate the low-latency communication links…
Read MoreSDA Posts RFI Seeking Industry Feedback for Tranche 0 MSE&I
Responses due by June 8, 2020 The Space Development Agency (SDA) seeks industry feedback on Tranche 0 Mission Systems Engineering and Integration (MSE&I). The scope of MSE&I support is delivery of an integrated, interoperable Tranche 0 system-of-systems to include integration of Transport and Tracking space vehicles, Naval Research Laboratory-based ground systems and hardware/software-in-the-loop testbeds. MSE&I…
Read MoreSMC Issues RFI Seeking Industry Feedback on SDA’s Tranche 0 Launch
The U.S. Space Force, Space and Missile Systems Center seeks information through a Request for Information (RFI) from prospective launch service providers to support the Space Development Agency (SDA) first generation (called “Tranche 0”). The SDA Tranche 0 Space Vehicle (SV) manifest will consist of up to 30 large spacecraft of 4 different types…
Read MoreSDA RFP Seeks Industry Proposals for Tranche 0 MSE&I
Response Date: August 13, 2020 Today, SDA posted a Request for Proposal (RFP) for SDA’s first generation (called Tranche 0) Mission Systems Engineering and Integration (MSE&I). The RFP seeks to provide systems engineering and integration services for SDA’s satellite and ground programs to field in late fiscal year 2022. SDA is soliciting industry partners to…
Read MoreSDA Posts RFI Seeking Industry Feedback for Tranche 0 MSE&I
The Space Development Agency (SDA) seeks industry feedback on Tranche 0 Mission Systems Engineering and Integration (MSE&I). The scope of MSE&I support is delivery of an integrated, interoperable Tranche 0 system-of-systems to include integration of Transport and Tracking space vehicles, Naval Research Laboratory-based ground systems and hardware/software-in-the-loop testbeds. MSE&I will culminate in a Capstone demonstration…
Read MoreSMC Issues RFI Seeking Industry Feedback on SDA’s Tranche 0 Launch Responses
Responses Due: June 5th, 2020 The U.S. Space Force, Space and Missile Systems Center seeks information through a Request for Information (RFI) from prospective launch service providers to support the Space Development Agency (SDA) first generation (called “Tranche 0”). The SDA Tranche 0 Space Vehicle (SV) manifest will consist of up to 30 large spacecraft…
Read MoreSDA to Host By-Invite Industry Day for HALO Pool Vendors and Prospective Payload Providers to discuss Tranche 2 Demonstration and Experimentation (T2DES) Europa Prototype Order
Posted on: December 20, 2024 Industry Day: February 10-11, 2025 Responses to Special Notice Due: January 22, 2025 The Space Development Agency, in conjunction with Massachusetts Institute of Technology Lincoln Laboratory, will host an industry day for Hybrid Acquisition for Proliferated LEO (HALO) pool members and invited potential payload providers February 10-11, 2025 in Lexington,…
Read More