SDA Posts RFI Seeking Industry Feedback for Tranche 0 MSE&I

The Space Development Agency (SDA) seeks industry feedback on Tranche 0 Mission Systems Engineering and Integration (MSE&I).  The scope of MSE&I support is delivery of an integrated, interoperable Tranche 0 system-of-systems to include integration of Transport and Tracking space vehicles, Naval Research Laboratory-based ground systems and hardware/software-in-the-loop testbeds.  MSE&I will culminate in a Capstone demonstration of early warfighter effectiveness and suitability in FY2023.  Industry feedback on approach and requirements is requested by June 8, 2020.  READ MORE